国产在线麻豆-国产在线麻豆精品-国产在线麻豆日韩蜜桃-国产在线麻豆影院-国产在线麻豆自在-国产在线麻豆自在拍91精品

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 国产精品亚洲二线在线播放| 亚洲av永久无码天堂网手机版| 精品久久免费一区二区三区四区| 大香区一二三四区2025| 久久精品人妻无码一区二区三区盗| 四虎成人精品一区二区免费网站| 亚洲精品色情AAA片| 亚洲图区综合| 夂久精品国产久精国产| 亚洲综合一区二区三区四区| 亚洲精品无码午夜| 亚洲高清国产拍青青草原| 亚洲国产欧美另类一区二区 | 国产入口在线观看| 国产成人啪精品视频免费软件| 91人妻精品一区二区三区蜜桃| 久久国产精品99久久久久久老狼 | 综综综综合网| 中文字幕日韩精品一区| 中文字幕久精品在线观看| 一区精品视频在线观看免费| 一本色道久久综合无码人妻| 制服丝袜在线一区| 亚洲热妇无码av在线播放| 亚洲欧美另类在线一区二区三区| 亚洲成人网址在线播| 香港三级日本三级妇人三级| 无套和妇女做内谢| 日本中文字幕∨在线观看| 欧美日韩高清一本大道免费| 欧美老妇毛茸茸二毛| 免费A级毛片黄A片高清在线播放| 黑料爆料一区二区三区| 国产片AV片永久免费观看| 国产日韩欧美另类| 国产精品久线在线观看| 国产成人狂喷潮在线观看2345| 国产av人人夜夜澡人人爽麻豆| 扒开粉嫩小泬舌头伸进去视频 | 久久久国产一区二区三区| 国产精品无码久久久久久|