国产在线麻豆-国产在线麻豆精品-国产在线麻豆日韩蜜桃-国产在线麻豆影院-国产在线麻豆自在-国产在线麻豆自在拍91精品

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 精品视频一区二区三区中文字幕| 99久久免费只有精品国产| 三个老头同嫖一个老妇| 少女高清影视在线观看动漫| 日韩 亚洲 制服 欧美 综合| 免费毛片网站在线观看| 人妻少妇精品| 人妻系列无码专区免费视频| 老熟女重囗味hdxx70星空| 精品欧美在线免费观看| 国产久爱青草视频在线观看| 国产人妻人伦精品熟女麻豆| 国产传媒精品1区2区3区| 办公室制服丝祙在线播放| 91久久精品国产91久久性色也| 国产日韩精品一区二区三区在| 国产日韩欧美一二三四| 欧美人与动性xxxxbbbb| 亚洲av日韩av永久无码色欲| 亚洲福利电影一区二区?/又粗又硬又大还不快进来吗/免费 | 国产三级电影网| 国产成人精品综合久久久免费观看| 国产国拍精品亚洲A片男同| 99精品人妻少妇一区二区| 国产精品自拍视频相关内容首页| 麻豆精品国产福利在线观看| 人妻无码中文字幕| 亚洲国产精品电影99| 在线看片免费人成视频在线影院| 亚洲精品成人网站在线播放| 日韩做A爰片久久毛片A片毛茸茸| 久久国产水蜜桃久久网站| 国产成人一区二区不卡| 3d动漫精品啪啪一区二区中文| 精品视频一区二区| 亚洲av午夜福利精品一区二区| 中字人妻内射喷潮第二页| 一区二区三区网站| 亚洲aⅴ精品无码一区二区pro| 欧美黑人一区二区三区免费A片| 久久精品免视看国产明星|